XL231's signal flare rack, mounted in the cabin roof, removed for over overhaul and repainting.
The RAF had carried out a crude repair to reinforce the rack as the stowage socket for the Navigators oxygen and comms lead 'umblical' had at some point been been torn out. I decided to leave the repair as it would have been a major task to totally rebuild the panel
No comments:
Post a Comment